Paper | Title | Page |
---|---|---|
TUPB82 |
Development of Laser Wire System in the Electron Beam Transport Line of BEPCⅡ | |
|
||
Funding: National Natural Science Foundation of China A Laser Wire system is under development in the electron beam transport line of BEPCⅡ (Beijing Electron Positron Collider Ⅱ). The whole system will be installed in the tunnel of beam transport line in this summer shutdown of the BEPCII. We present recent work on subsystems of Laser Wire in this paper, such as improvement of laser system and construction of gamma detector. Some measurement and test results are also showed. The electron beam profile measurement experiment with Laser Wire will start in the next accelerator run. |
||
TUPB86 |
An Upgrade for the Bunch Current Measurement System of BEPCⅡ | |
|
||
Recently, the BCM (Bunch Current Measurement) system is being developed at BEPCⅡ(Beijing Electron-Positron ColliderⅡ). In order to solve the instability problems which frequently happen in the existing system, we have upgraded the DAQ system with new ADC card and new DSP arithmetic in FPGA. In addition, some discussion for the upgrade such as the generality of the arithmetic, easy to change operation mode, noise reduction measurements, and so on, are also presented in this paper. | ||