Welcome to KEK e+/e- Linac
-
KEK e+/e- Linac injects 8GeV electrons and 3.5 GeV positrons to the KEKB
(B-Factory) ring.
It also provides 2.5 GeV positrons / electrons to PF (Photon Factory) and PF-AR.
The slow positron facility in Linac is being upgraded.
The picture on the right shows the beam switch yard at the end of 600m-long
Linac.
|
|