LINAC Seminar

Presentation Date and Time Place Presenter Affiliation Presentation Title Abstract Slide File
Mon., Mar. 11, 2024, 13:30-14:30 Meeting room, 7F, 3gokan Bldg.and Zoom Dr. Volker R.W. Schaa Helmholtzzentrum für Schwerionenforschung (GSI) JACoW Activity for Accelerator Community
Tue., Nov. 2, 2021, 15:00-17:00 Meeting room, 7F, 3gokan Bldg.and Zoom Dr. Takao Asaka National Institutes for Quantum Science and Technology (QST) 市販のグリッド付き熱カソードを用いた低エミッタンス電子銃の開発
Fri., Feb. 21, 2020, 15:30-16:30 Meeting room, 7F, 3gokan Bldg. Dr. Alexander Novokhatski SLAC National Accelerator Laboratory, Menlo Park, USA Accelerator projects and development of the accelerator technology
Thu., Nov. 22, 2018, 13:30-14:30 Meeting room, 5F, 3gokan Bldg. Dr. Jingru Zhang Institute of High Energy Physics (IHEP), Beijing, China Overall Design of the CEPC Injector Linac
Wed., Nov. 7, 2018, 14:30-16:00 Meeting room, 7F, 3gokan Bldg. Dr. Takuya Kamitani KEK Linac Linacビーム調整のための基礎知識
Thu., Oct. 18, 2018, 16:00-18:00 Meeting room, 7F, 3gokan Bldg. Dr. Satoshi Ohsawa KEK Linac LINAC熱電子銃ビームのバンチング調整法について
Fri., Dec. 1, 2017, 13:30-15:00 Meeting room, 7F, 3gokan Bldg. Mr. Salim Ogur CERN, Switzerland FCC-ee 20 GeV S-Band + C-Band Linac & Damping Ring
Thu., Oct. 26, 2017, 14:00-15:30 Meeting room, 7F, 3gokan Bldg. Dr. Aleksey E. Levichev, Dr. D.A. Nikiforov Budker Institute of Nuclear Physics, Novosibirsk (BINP) S-band RF gun based on new type accelerating structure
Thu., Sep. 28, 2017, 15:30-17:00 Meeting room, 7F, 3gokan Bldg. Dr. Kenichi Yanagida Japan Synchrotron Radiation Research Institute (JASRI) SPring-8線型加速器六電極ビーム位置モニタによる二次相対モーメントの測定とその応用
Tue., Sep. 26, 2017, 13:30-15:00 Meeting room, 7F, 3gokan Bldg. Dr. Akihiko Mizuno Japan Synchrotron Radiation Research Institute (JASRI) Bulk-To-Point 法を用いた極低エミッタンスビーム評価用トラッキングシミュレーションコード
Mon., May. 22, 2017, 13:30-15:30 Meeting room, 7F, 3gokan Bldg. Mr. Ralph Lange Control System Coordinator, ITER Organization, France EPICS - Recent Developments, New Features, Great Plans
Mon., May. 22, 2017, 10:30-12:00 Meeting room, 1F, 2gokan Bldg. Mr. Ralph Lange Control System Coordinator, ITER Organization, France ITER and its Control System - Status and Perspectives
Wed., Apr. 26, 2017, 15:00-16:30 Meeting room, KEKB Control Bldg. Hitoshi Sugimura KEK Linac microTCA研究会の報告
Wed., Mar. 29, 2017, 10:00-11:30 Meeting room, 7F, 3gokan Bldg. Tsuyoshi Suwada, Yoshinori Enomoto, Kazuhisa Kakihara, Katsuhiko Mikawa, Toshiyasu Higo KEK Linac 500m級超高精度レーザー直尺を用いた 微小地面変動の連続観測技術の開発
Wed., Nov. 30, 2016, 13:30-14:30 Meeting room, KEKB Control Bldg. Mr. Jyun Yan Chuang National Synchrotron Radiation Research Center (NSRRC), Taiwan Introductions to Taiwan Photon Source and Control System
Tue., Nov. 1, 2016, 10:30-11:00 Meeting room, 7F, 3gokan Bldg. Mr. Salim Ogur CERN, Switzerland FCC-ee Injector Design Study
Tue., Oct. 11, 2016, 15:00-16:15 Meeting room, 7F, 3gokan Bldg. Dr. Munawar Iqbal Centre for High Energy Physics, University of the Punjab, Lahore-Pakistan Design, Fabrication and Test of Thermionic Electron Beam Emitter Assemblies
Wed., Apr. 8, 2015, 13:30-15:00 Meeting room, 7F, 3gokan Bldg. Dr. Jae-Young Choi Pohang Accelerator Laboratory (PAL), Korea PLS-II Linac
Fri., Feb. 7, 2014, 13:30-15:00 Meeting room, KEKB Control Bldg. Dr. Guobao Shen NSLS-II Controls Group, BNL, USA. NSLS II Controls and Commissioning (Internal) (Internal)
Thu., Feb. 6, 2014, 13:30-15:00 Meeting room, 3gokan 7F. Dr. Guobao Shen NSLS-II Controls Group, BNL, USA. Middle Layer Service at NSLS II for Beam Commissioning and Operation
Thu., Jun. 14, 2012, 13:30-15:10 Meeting room 5F, Bldg. #3 Mr. Anindya Roy Variable Energy Cycrotron Center (VECC), Kolkata, India Development of fast controls for beam wire scanner at SuperKEKB
Cyclotron control system in VECC (Internal)
Tue., Apr. 24, 2012, 15:30-16:30 Meeting room, KEKB Control Bldg. Dr. Yin Chongxian Electronic Group, SINAP, Shanghai, China The overview of SINAP timing system
Tue., Jul. 22, 2011, 14:00-15:00 Large Meeting room, 2goukan 1F. Dr. Kay Kasemir SNS Controls Group, ORNL, USA Control System Studio (CSS) Overview
Fri., Jan. 7, 2011, 15:00-16:00 Meeting room, KEKB Control Bldg. Dr. Yin Chongxian Electronic Group, SINAP, Shanghai, China The development of SINAP timing system and upgrading
Thu.,Fri., Feb. 18,19, 2010, 9:30-11:50 Meeting room, KEKB Control Bldg. Ms. Prachi Chitnis Raja Ramanna Centre for Advanced Technology (RRCAT), Indore, India CSS (Control System Studio) Training
Fri., Jan. 22, 2010, 10:30-11:50 Meeting room, KEKB Control Bldg. Ms. Prachi Chitnis Raja Ramanna Centre for Advanced Technology (RRCAT), Indore, India EPICS-based Control System for Microtron at RRCAT/Indore
Wed., Aug. 26, 2009, 10:30-11:00 Meeting room, 7F, Bldg #3 Dr. Hayanori Takei JAEA 打ち切り事象を考慮したクライストロン系の平均トリップ間隔の算出
Tue., Feb. 24, 2009, 14:00-15:00 Meeting room, 5F, Bldg #3 Mr. Takashi Asakawa, Mr. Hajime Nakamura Yokogawa Electric Co. EPICS Device Support for SL1000 Digitizers
Fri., Feb. 13, 2009, 13:30-16:00 Meeting room, 7F, Bldg #3 Dr. Lei Ge, Dr. Li Gang, Dr. Jiang Geyang, Dr. Zhou Dayong IHEP/Beijing, SSRF/Shanghai 7 Talks on Controls and Timings at IHEP and SSRF Presentations
Mon., Jun. 23, 2008, 13:30-15:00 Meeting room, KEKB Control Bldg. Dr. Georg Gaderer, Dr. Patrick Loschmidt Austrian Academy of Sciences New Timing System Presentations
Mar. 6 - 26, 2008 KEKB Control Bldg., PF Bldg. Dr. Stefan Simrock DESY 7 Lectures on LLRF, Timing and Euro-XFEL Presentations
(Local Copies)
Wed., Dec. 20, 2006, 10:30-11:15 Meeting room, 7F, Bldg #3 Dr. Jian Wang Department of Modern Physics,
Univ. of Sci. & Tech. China
Development of Windows Oscilloscope-based IOC
Thursday, Dec. 8, 2005, 13:30 - 15:00 Meeting room, 2F, Bldg #2. Dr. Christopher K. Allen Los Alamos National Laboratory (LANL) Bunched Beam Envelope Simulation with Space Charge within the SAD Environment Presentation & Related Papers
Thursday, Feb. 24, 2005, 13:50 - 14:10 Meeting room, 1F, Bldg #3 K. Furukawa KEK Linac Present Status and Future Upgrade of KEKB Injector Linac
Friday, Feb. 18, 2005, 10:30 - 12:00 Meeting room, KEKB Control Bldg. Dr. Christopher K. Allen Los Alamos National Laboratory (LANL) Overview of the XAL High-Level Applications Programming Framework Presentation & Related Papers
Thursday, Jan. 20, 2005, 13:30 - 15:00 Meeting room, 2F, Bldg #2 Dr. Christopher K. Allen Los Alamos National Laboratory (LANL) An Adaptive Space Charge Algorithm for Three-Dimensional RMS Beam Envelope Simulation Presentation & Related Papers
Tuesday, Mar. 9, 2004, 13:30 - 15:00 Meeting room, 7F, Bldg #3 M. Shimada KEK Linac 光散乱モデルを用いた皮膚と刺青の色解析に関する研究 OHP1 OHP2
Thursday, Feb. 19, 2004, 17:20 - 17:40 (LCPAC2004) Conference room, 1F, Bldg#3 S. Ohsawa KEK Linac C-Band Linac Development  
Feb. 23, 2002 Robert Chehab Laboratoire de l'Accelerateur Lineaire, Orsay, France (1) DIAGNOSTICS TOOLS for SMALL-SIZE BEAMS
(2) ACCELERATOR R & D at LAL-ORSAY
Jan. 24, 2002 Robert Chehab Laboratoire de l'Accelerateur Lineaire, Orsay, France USE OF CHANNELING RADIATION AND RELATED CRYSTAL EFFECTS FOR A NEW POSITRON SOURCE


Jan.27.2002 - Mar.11.2024.
[Linac-Seminar]   [Accelerator-Seminar]   [Accelerator-Physics-Seminar]   [KEK-Seminar]   [KEK-Past-Seminar]   [KEK-Past-Past-Seminar]   [Linac]   [Accelerator]   [KEK]